Computer Science & Technology

Browse 850+ computer science and technology textbooks — programming languages, AI and machine learning, cybersecurity, networking, software engineering, and IT certifications.

What's inside

  • Programming (Python, Java, C++, JavaScript) and algorithms
  • AI, machine learning, and data science
  • Cybersecurity, network security, and CompTIA prep
  • Software engineering and DevOps
  • Robotics, embedded systems, and hardware
  • Computer graphics, game development, and animation

Who it's for

Computer science and software engineering students, IT professionals, developers, security analysts, data scientists, and self-taught programmers.

Why Book Shop Now

Authentic editions from CRC Press, Springer, Cengage, Wiley, and O'Reilly. Verified ISBNs and fast US shipping.

2230 products
Reindeer and Caribou Health and Disease by Morten TrylandSaleSold out
Taylor & Francis Group

Reindeer and Caribou Health and Disease by Morten Tryland

$106.99 $88.03
Applied Nonparametric Statistical Methods, Fourth Edition by Peter SprentSale
CRC Press

Applied Nonparametric Statistical Methods, Fourth Edition by Peter Sprent

$140.00 $135.00
Designing with Xilinx® FPGAs Using Vivado by Sanjay ChuriwalaSale
Springer International Publishing

Designing with Xilinx® FPGAs Using Vivado by Sanjay Churiwala

$159.99 $136.40
Optics of the Human Eye by David A. AtchisonSale
CRC Press

Optics of the Human Eye by David A. Atchison

$189.99 $182.66
Buck's 2026 ICD-10-CM for Hospitals by ElsevierSaleSold out
Elsevier

Buck's 2026 ICD-10-CM for Hospitals by Elsevier

$120.99 $111.31
Essential Mathematics for Games and Interactive Applications, Third Edition by James M. Van VerthSale
Taylor & Francis

Essential Mathematics for Games and Interactive Applications, Third Edition by James M. Van Verth

$166.99 $125.08
A Practical Guide to Splines by Carl de BoorSaleSold out
Springer New York

A Practical Guide to Splines by Carl de Boor

$109.00 $86.58
Human Performance on the Flight Deck by Don HarrisSale
Ashgate Publishing, Ltd.

Human Performance on the Flight Deck by Don Harris

$77.99 $69.24
Local Food Environments Food Access in America by Kimberly B. MorlandSaleSold out
Taylor & Francis Group

Local Food Environments Food Access in America by Kimberly B. Morland

$84.99 $69.35
Time Series A Data Analysis Approach Using R by Robert H. ShumwaySale
CRC Press, Taylor & Francis Group

Time Series A Data Analysis Approach Using R by Robert H. Shumway

$102.99 $86.54
Case Studies on Safety, Bullying, and Social Media in Schools Current Issues in Educational Leadership by Laura Trujillo-JenksSale
Routledge

Case Studies on Safety, Bullying, and Social Media in Schools Current Issues in Educational Leadership by Laura Trujillo-Jenks

$62.99 $57.00
The Audio Expert Everything You Need to Know about Audio by Ethan WinerSaleSold out
Taylor & Francis Group

The Audio Expert Everything You Need to Know about Audio by Ethan Winer

$77.99 $53.66
Welcome Problems, Find Success Creating Toyota Cultures Around the World by Kiyoshi Nate FurutaSale
Productivity Press

Welcome Problems, Find Success Creating Toyota Cultures Around the World by Kiyoshi Nate Furuta

$51.99 $49.48
Managing Design Conversations, Project Controls, and Best Practices for Commercial Design and Construction Projects by Michael LeFevreSale
John Wiley & Sons

Managing Design Conversations, Project Controls, and Best Practices for Commercial Design and Construction Projects by Michael LeFevre

$80.95 $68.88
An Introduction to Biomechanics Solids and Fluids, Analysis and Design by Jay D. HumphreySaleSold out
Springer New York

An Introduction to Biomechanics Solids and Fluids, Analysis and Design by Jay D. Humphrey

$129.99 $87.30
When Trucks Stop Running Energy and the Future of Transportation by A.J. FriedemannSale
Springer International Publishing

When Trucks Stop Running Energy and the Future of Transportation by A.J. Friedemann

$89.99 $59.30
Near-earth Laser Communications by Hamid HemmatiSale
CRC Press

Near-earth Laser Communications by Hamid Hemmati

$350.00 $238.24
A Case Study for Computer Ethics in Context The Scandal in Academia by Michael James HeronSaleSold out
Taylor & Francis Limited (Sales)

A Case Study for Computer Ethics in Context The Scandal in Academia by Michael James Heron

$70.99 $45.89
Trends and Issues in Instructional Design and Technology by Robert A. ReiserSaleSold out
Taylor & Francis Group

Trends and Issues in Instructional Design and Technology by Robert A. Reiser

$78.99 $52.53
Structural Design for the Stage by Alys HoldenSaleSold out
Focal Press

Structural Design for the Stage by Alys Holden

$233.99 $161.45
Essential MATLAB for Engineers and Scientists by Daniel T. ValentineSaleSold out
Elsevier Science

Essential MATLAB for Engineers and Scientists by Daniel T. Valentine

$64.95 $59.75
Probability and Statistics for Data Science Math + R + Data by Norman S. MatloffSaleSold out
CRC Press, Taylor & Francis Group

Probability and Statistics for Data Science Math + R + Data by Norman S. Matloff

$89.99 $48.77
Aircraft Control and Simulation Dynamics, Controls Design, and Autonomous Systems by Brian L. StevensSaleSold out
John Wiley & Sons

Aircraft Control and Simulation Dynamics, Controls Design, and Autonomous Systems by Brian L. Stevens

$176.95 $96.60
Embedded and Fan-Out Wafer and Panel Level Packaging Technologies for Advanced Application Spaces High Performance Compute and System-in-Package by Beth KeserSaleSold out
John Wiley & Sons

Embedded and Fan-Out Wafer and Panel Level Packaging Technologies for Advanced Application Spaces High Performance Compute and System-in-Package by Beth Keser

$154.95 $119.75