Engineering & Architecture

Engineering and architecture textbooks — mechanical, civil, electrical, and design. Authentic US editions with verified ISBNs and free US shipping.

Filter:Add storefront filters in Online Store → Navigation → Filters to enable filtering.
460 products
Cryogenic Engineering, Revised and Expanded by Thomas FlynnSale
Taylor & Francis Group

Cryogenic Engineering, Revised and Expanded by Thomas Flynn

$72.99 $39.12
Millwork The Design and Manufacturing of Historic Millwork from 1740 - 1950Sale
John Wiley & Sons

Millwork The Design and Manufacturing of Historic Millwork from 1740 - 1950

$71.95 $42.53
Spider Biology by Rainer FoelixSale
Springer Nature Switzerland

Spider Biology by Rainer Foelix

$84.99 $48.28
Symbol Sourcebook An Authoritative Guide to International Graphic Symbols by Henry DreyfussSale
John Wiley & Sons

Symbol Sourcebook An Authoritative Guide to International Graphic Symbols by Henry Dreyfuss

$61.95 $36.23
Passive House Details Solutions for High-performance Design by Donald CornerSale
Routledge

Passive House Details Solutions for High-performance Design by Donald Corner

$70.99 $51.47
Leadership in Planning How to Communicate Ideas and Effect Positive ChangeSale
Routledge

Leadership in Planning How to Communicate Ideas and Effect Positive Change

$51.99 $31.00
Adaptive Reuse of the Built Heritage Concepts and Cases of an Emerging DisciplineSale
Routledge

Adaptive Reuse of the Built Heritage Concepts and Cases of an Emerging Discipline

$62.99 $47.02
Practical Building Conservation: Conservation BasicsSale
Taylor & Francis Limited

Practical Building Conservation: Conservation Basics

$52.99 $44.99
The Art of the New Urbanism, Volume 1 (1980 - 2010)Sale
John Wiley & Sons

The Art of the New Urbanism, Volume 1 (1980 - 2010)

$61.95 $45.32
Reciprocal Landscapes Stories of Material MovementsSale
Taylor & Francis Group

Reciprocal Landscapes Stories of Material Movements

$62.99 $44.46
Destructive Turfgrass Insects Biology, Diagnosis, and ControlSale
John Wiley & Sons

Destructive Turfgrass Insects Biology, Diagnosis, and Control

$149.95 $33.80
Roman Emperors in Context Theodosius to JustinianSale
Routledge

Roman Emperors in Context Theodosius to Justinian

$60.99 $52.19
INCOSE Needs and Requirements Manual Needs, Requirements, Verification, Validation Across the LifecycleSale
John Wiley & Sons

INCOSE Needs and Requirements Manual Needs, Requirements, Verification, Validation Across the Lifecycle

$97.95 $51.36
Lighting Design BasicsSale
John Wiley & Sons

Lighting Design Basics

$78.95 $49.04
Inscribing Faith in Late Antiquity Between Reading and SeeingSale
Taylor & Francis Group

Inscribing Faith in Late Antiquity Between Reading and Seeing

$61.99 $51.29
Project Management Case StudiesSale
John Wiley & Sons

Project Management Case Studies

$75.95 $38.47
Building Women Leaders A Blueprint for Women Thriving in ConstructionSale
John Wiley & Sons

Building Women Leaders A Blueprint for Women Thriving in Construction

$76.95 $52.03
Managing the Profitable Construction Business The Contractor's Guide to Success and Survival StrategiesSale
John Wiley & Sons

Managing the Profitable Construction Business The Contractor's Guide to Success and Survival Strategies

$72.95 $50.23
Flashpoint Hagia SophiaSale
Routledge

Flashpoint Hagia Sophia

$58.99 $50.39
Details and Materials for Resilient Sites A Climate Positive ApproachSale
Routledge, Chapman & Hall, Incorporated

Details and Materials for Resilient Sites A Climate Positive Approach

$57.99 $52.19
BIM Handbook A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility ManagersSale
John Wiley & Sons

BIM Handbook A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers

$111.95 $65.72
Drawing from the Model Fundamentals of Digital Drawing, 3D Modeling, and Visual Programming in Architectural DesignSale
John Wiley & Sons

Drawing from the Model Fundamentals of Digital Drawing, 3D Modeling, and Visual Programming in Architectural Design

$72.95 $51.11
Aluminum Surfaces A Guide to Alloys, Finishes, Fabrication and Maintenance in Architecture and ArtSale
John Wiley & Sons

Aluminum Surfaces A Guide to Alloys, Finishes, Fabrication and Maintenance in Architecture and Art

$80.95 $58.95
Architectural Detailing Function Constructability AestheticsSale
John Wiley & Sons

Architectural Detailing Function Constructability Aesthetics

$92.95 $57.76